How We Work

Quality, Safety and Responsibility — Built In

Quality Management

Quality Is Built In, Not Inspected In

ISO 9001:2015 certified

Quality is integrated into our construction process from procurement through final handover.

  • Approved materials and qualified suppliers
  • Inspection and testing plans (ITPs)
  • Material and work inspections
  • Method statements and technical records
  • Non-conformance control and corrective actions
  • Document control and quality records
  • Final inspection, snagging and handover

Health, Safety & Environment

Safe People. Safe Projects. Safe Communities.

ISO 45001:2018 · 14001:2015

We work to a zero-incident goal: every high-risk activity is assessed and controlled.

  • HSE planning, risk assessments and job safety analysis
  • Permit to work for hot work, heights, confined spaces and lifting
  • Induction, toolbox talks and safety training for every worker
  • PPE enforced, with weekly HSE inspections and walk-downs
  • Emergency response, incident investigation and corrective action
  • Dust, noise and spill controls, waste segregation and housekeeping

Sustainability

Responsible Construction for a Sustainable Future

We work to reduce the footprint of construction while protecting the performance and longevity of what we build.

  • Efficient use of materials and resources
  • Reduction, segregation and responsible disposal of waste
  • Energy-efficient construction methods
  • Water conservation
  • Sustainable procurement where practical
  • Environmental protection and site housekeeping
  • Lifecycle performance and maintainability

Our ISO certificates

ISO 9001:2015 certificate issued to Start Over Contracting Company
ISO 9001:2015Quality Management System
ISO 45001:2018 certificate issued to Start Over Contracting Company
ISO 45001:2018Occupational Health & Safety
ISO 14001:2015 certificate issued to Start Over Contracting Company
ISO 14001:2015Environmental Management System

How a scope of work passes through our quality system

01

Material approval

Data sheets, samples and supplier credentials submitted before purchase.

MAR
02

Method statement

Sequence, resources, risks and checks defined for each activity.

03

Inspection & Test Plan

Hold and witness points, tests and acceptance criteria agreed in advance.

ITP
04

Execution & inspection

Supervised crews, with the consultant inspecting at every hold point.

WIR / MIR
05

Final handover

Snagging, commissioning, as-builts, O&M manuals, warranties and training.

Failed inspection? A Non-Conformance Report is raised, the root cause corrected and the work re-inspected before it moves on.

Stop Work Authority

Every person on an SOCC site may stop work they believe is unsafe — without penalty.

QA/QC and HSE hold independent authority to stop non-conforming or unsafe work.