Delivering Through Capability

Project Experience

Twenty-three project assignments delivered across campus infrastructure, electrical networks, civil construction, renovation and telecommunications. Much of the portfolio was delivered on the live campus of King Fahd University of Petroleum and Minerals, keeping services running for students and staff throughout.

  • 6Utilities & services
  • 5Electrical power
  • 6Renovation & interiors
  • 2Civil & urban
  • 4Telecom OSP & fibre

Utilities & Networks

Rehabilitated utility tunnel with chilled-water mains on new supports

Rehabilitation of Tunnel Utilities – KFUPM

Rehabilitation of the service runs carried through the campus utility tunnels, delivered across three separate work packages.

Water main pipework laid in an open trench

Rehabilitation of Water Network – Nakheel Housing Area, KFUPM

Diversion of electrical and water services to allow rehabilitation of the Nakheel housing area water network.

Cable tray runs in an electrical plant room

Power Supply for New Projects

Electrical power supply works establishing the supply required for new project areas.

Electrical Infrastructure

Medium-voltage cables laid on supports in a cable room

Medium-Voltage Lines Feeding Student Housing

Urgent repair and replacement of medium-voltage lines on the network feeding student housing.

Power cables being drawn into a trench

Electrical Power Source for Buildings 4 & 8 – Rental Chillers

Civil and electrical works developing the power source for the rental chiller units serving Buildings 4 and 8.

Distribution panel and control equipment

Electrical Infrastructure Upgrade – Staff Housing, Morouj Court

Second-phase upgrade of the electrical infrastructure serving the Morouj Court staff housing area.

Electrical switchgear and cabling installation

Electrical System Upgrade – Nakheel Court

Conversion of the Nakheel Court electrical system from 220/110 V to the IEC standard of 400/230 V.

Civil & Construction

The rehabilitated central fountain lake with its fountains running

Rehabilitation of Central Fountain Lake – KFUPM

Rehabilitation of the central fountain lake on the KFUPM campus, from the reinforced concrete works to the completed water feature and landscaping.

Valves and pipework being installed in a services chamber

MEP Works for Central Lab Building

Mechanical, electrical and plumbing works for the Central Lab Building, including diversion of the electrical, drainage and water services.

Service pipework and cable tray installed along a building

MEP Works for 7 Female Hostel Buildings – KFUPM

Mechanical and electrical works, with diversion of the existing services and the associated site works, for seven female student hostel buildings.

Interlock paved plaza with mature trees

Redevelopment of City Center and Al Khobar Historic Furdha

Works delivered as subcontractor on the redevelopment of the city centre and the historic Al Khobar Furdha.

Renovation & Fit-Out

Laboratory benches, service spines and reagent shelving

Health and Life Sciences Laboratory – DTV Building

Development, modification and interior design of the Health and Life Sciences Laboratory, including laboratory rehabilitation works.

New water main with gate valves laid in an open trench

MEP Works for Renovation of Building No. 26

Mechanical, electrical and plumbing works for the full renovation of Building No. 26.

Butt-fusion machine jointing HDPE water pipe in a trench

MEP Works for Renovation of Building No. 15

Mechanical, electrical and plumbing works for the full renovation of Building No. 15.

Renovated washroom with basins and toilet cubicles

Renovation of Toilets in Academic Buildings

Renovation of the toilet facilities across the academic buildings.

Gymnasium fitted with exercise machines

Renovation of Gymnasium & Outdoor Courts – Buildings 36 and 39

Renovation of the gymnasium and the outdoor courts serving Buildings 36 and 39.

Completed villa entrance with paved forecourt and landscaping

Renovation of Villas & Site Development – Farooq Courts, Phase III

Third-phase villa renovation together with the site development works at Farooq Courts.

Telecommunications

Reels of fibre-optic cable and ducts staged for installation

Fiber Connectivity to DC Iskan & 5G Sites

Civil and fibre works connecting DC Iskan to the DMM 020 point of presence over approximately 600 metres, and outside plant connectivity delivered to GSM / 5G sites.

Cable route prepared alongside a carriageway

Business Customers Connectivity & Metro Route Relocation

Outside plant connectivity delivered to business units, and relocation of existing cable onto a new route for the metro.

Photography is taken from SOCC site records and illustrates the type of work in each category rather than a specific project. Client references and completion certificates are available on request. START OVER CONTRACTING COMPANY holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certification — see Certifications — and its commercial registration, contractor classification and VAT registration are listed in full under Registrations & Compliance.